
See a Fair Price for Your Toronto Kitchen Before Anyone Visits
Renovating a 150 sq ft kitchen in Toronto with 20 linear feet of cabinets and quartz counters costs about $33,000 to $51,600 CAD before HST at 2026 prices. The low end keeps the layout and standard finishes, and the high end moves the sink or range, adds new circuits, and upgrades the finishes.
The layout is the biggest choice. Moving a sink, range, or wall adds plumbing, electrical, and patching work to the job.
Prices updated October 2026
Price Your Kitchen
Your Project So Far
Project Total
What Changes the Cost
- Cabinets: More linear feet and a higher finish level raise the largest part of the price.
- Countertops: Natural stone costs more than quartz, and quartz costs more than laminate.
- Plumbing and electrical: Moving the sink, range, or dishwasher adds new lines, and new circuits add electrical work.
- Ventilation and lighting: A range hood vented outside needs a duct through the wall or roof.
- Walls and finishes: New walls, ceilings, and floors add to the job, and so does matching the rooms next to the kitchen.



What Your Estimate Includes
Your estimate covers demolition, cabinets, countertops, fixtures, installation, and the plumbing and electrical changes you select. Appliances are in the price when you tick the appliance box, and you supply your own when you leave it unticked.
Before

After

What True Frame Builders Checks Before Your Quote

A larger opening to the next room often means removing a load-bearing wall, which is priced as its own part of your project. True Frame Builders checks every wall you want to open. Your final price depends on site conditions, measurements, chosen materials, and the full work plan. True Frame Builders visits, measures, and then sends your quote.
Common Questions
How much does a kitchen renovation cost in Toronto?
Renovating a 150 sq ft kitchen with 20 linear feet of cabinets and quartz counters costs about $33,000 to $51,600 CAD before HST at 2026 prices. The low end keeps the layout and standard finishes, and the high end moves the sink or range, adds new circuits, and upgrades the finishes. Your own cost depends on your answers in the estimate and the condition of your kitchen.
Does the estimate include plumbing and electrical work?
Yes. Select a new layout or new circuits in the estimate, and each choice adds its plumbing or electrical work to the price.
How do I keep my kitchen renovation cost down?
Keep the sink, range, and dishwasher where they are. A new layout adds plumbing, electrical, and patching work, and the estimate shows the difference when you switch between the two choices.
Plan the Next Part of Your Project
Many kitchen projects also include load-bearing wall removal, a whole-home renovation, or a home addition. Each one has its own estimate, and your saved estimates add up to one project total.